|
关注:1
2013-05-23 12:21
求翻译: It was noted that the facility does not maintain construction approval of one flat building used as raw material warehouse, one flat building used as finished goods warehouse and packing section, and one 2-floor building used security room. The facility stated that security room is an old building, which did not nee是什么意思? 待解决
悬赏分:1
- 离问题结束还有
It was noted that the facility does not maintain construction approval of one flat building used as raw material warehouse, one flat building used as finished goods warehouse and packing section, and one 2-floor building used security room. The facility stated that security room is an old building, which did not nee
问题补充: |
|
2013-05-23 12:21:38
据指出,该设施不能保持作为原料仓库,用作成品仓库,包装部一个单位建设一个单位的建筑施工审批,和一个2层楼的建筑用保障房。
|
|
2013-05-23 12:23:18
注意到,设施不维护作为原材料仓库使用的一个平的大厦建筑认同,作为制成品仓库和包装部分使用的一个平的大厦和一个2层大厦使用的安全室。设施阐明,安全室是一个老大厦,不需要建筑认同。然而,达成协议的证明不可能为回顾提供。
|
|
2013-05-23 12:24:58
它注意到,设施不维护一个平的大厦建筑认同使用当原料仓库,一个平的大厦使用作为制成品仓库和包装部分和一个2层大厦使用的安全室。 设施阐明,安全室是一个老大厦,不需要建筑认同。 然而,达成协议的证明不可能为回顾提供。
|
|
2013-05-23 12:26:38
有人指出设施不维护施工批准的用来作为原材料仓库一楼,一楼用作成品仓库和包装部分和一个 2 层楼用于保安室。该设施指出保安室是一个老的建筑,不需要建设审批。然而,根据证明不能提供进行审查。
|
|
2013-05-23 12:28:18
它被注意那设施不维持一座平的建筑物的建造审批用作原材料仓库,一座平的建筑物用作制成品仓库和装满部分,一间 2 块地板建造陈旧的安全房间。设施声明安全房间是一座旧建筑物,没有需要建造审批。然而,不能提供相符合证据被用于审核。
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区