当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Before installation of the lithium battery, ensure the switch to the "OFF" position, aim the port side aligned prongs or holes which on battery battery conversion pack, then push down to combination battery and battery conversion , then check the battery charge, and finally replace the battery cover which completed the是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Before installation of the lithium battery, ensure the switch to the "OFF" position, aim the port side aligned prongs or holes which on battery battery conversion pack, then push down to combination battery and battery conversion , then check the battery charge, and finally replace the battery cover which completed the
问题补充:

  • 匿名
2013-05-23 12:21:38
Vor der Installation des Lithium- Akkus sicher, den Schalter auf die Position "OFF" wollen die Backbordseite ausgerichtet Zinken oder Löcher , die auf Batterie Batterie Conversion Pack , dann nach unten drücken , um Kombination Batterie und Konvertierung, dann überprüfen Sie die Akkuladung , und sch
  • 匿名
2013-05-23 12:23:18
正在翻译,请等待...
  • 匿名
2013-05-23 12:24:58
Vor Installation der Lithiumbatterie, stellen Sie den Schalter in die "OFF" Position sicher, zielen Sie die Portseite ausgerichteten Zinken oder die Bohrungen, die auf Batteriebatterie-Umwandlung Satz, dann zur Kombination Batterie und zur Batterieumwandlung runterdrücken, überprüfen dann die Batter
  • 匿名
2013-05-23 12:26:38
Gewährleisten Sie vor der Installation der Lithium-Batterie den Schalter in die Position "OFF", Ziel der Backbordseite ausgerichtet, Zinken oder Löcher die auf Akku Batterie Konvertierung, dann drücken Sie, um Kombination Akku und Akku-Konvertierung, dann überprüfen Sie die Akkuladung und schließlic
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭