当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:The inspection quantity of actual finished products is 4145, and 1 defective product is found. The inspection sites are in three different places (YAN FENG Warehouse 、LEONI Third Party Warehouse and Jining LEONI Factory), which cause lots of nonworking time. Because the inspected products are finished articles, the tim是什么意思?

待解决 悬赏分:1 - 离问题结束还有
The inspection quantity of actual finished products is 4145, and 1 defective product is found. The inspection sites are in three different places (YAN FENG Warehouse 、LEONI Third Party Warehouse and Jining LEONI Factory), which cause lots of nonworking time. Because the inspected products are finished articles, the tim
问题补充:

  • 匿名
2013-05-23 12:21:38
的实际成品检验数量是4145 ,和1个有缺陷的产品被发现。
  • 匿名
2013-05-23 12:23:18
实际完成品的检查数量是4145,并且找到1次品。检查站点在三个不同地方(闫峰仓库、LEONI第三方仓库和济宁LEONI工厂),导致许多非工作的时间。由于被检查的产品是制成品,序列轮的时期大于检查时间。
  • 匿名
2013-05-23 12:24:58
实际完成品的检查数量是4145,并且1次品被找到。 检查站点在三不同地方 (严FENG仓库、LEONI第三方仓库和Jining LEONI工厂里),导致许多nonworking时间。 由于被检查的产品是制成品,序列轮的时期检查时间大于。
  • 匿名
2013-05-23 12:26:38
实际成品检验量 4145,并发现了 1 有缺陷的产品。视察地点都在三个不同的地方 (闫凤仓库、LEONI 第三方仓库和济宁莱尼厂),导致大量的非工作时间。因为检查的产品成品的文章,序列转的时间大于检验时间。
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭