当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:The quantities of Plant Starter Bar only and subject to the site measurement and verified by Contractor's site engineer. Before drilling work start, the Contractor’s surveyor will marking of the exact location to be drilled, and the starter bar to be cut accordingly to the requirement length and prepared at site before是什么意思?

待解决 悬赏分:1 - 离问题结束还有
The quantities of Plant Starter Bar only and subject to the site measurement and verified by Contractor's site engineer. Before drilling work start, the Contractor’s surveyor will marking of the exact location to be drilled, and the starter bar to be cut accordingly to the requirement length and prepared at site before
问题补充:

  • 匿名
2013-05-23 12:21:38
仅供参考,如有现场测量和验证的植物入门栏由承包商现场工程师的数量。
  • 匿名
2013-05-23 12:23:18
植物仅起始者酒吧的数量和受站点测量支配和核实由承包商的站点工程师。在钻前工作开始,承包商的测量员将操练的确切的地点的标号和起始者酒吧将相应地被切开对要求长度和准备在站点在钻wor前
  • 匿名
2013-05-23 12:24:58
植物仅起始者酒吧的数量和受站点测量支配和由Contractor的站点工程师核实。 在钻工作开始、将操练的确切的地点的承包商的测量员意志标号和起始者酒吧将相应地被切开到要求长度和准备在站点在钻wor之前之前
  • 匿名
2013-05-23 12:26:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:28:18
大量植物起始者酒吧仅仅和取决于地点测量和确认通过承包商的地点工程师。钻工作之前开始,承包商的检查员希望有待钻的精确的位置的评分,以及到要求期间有待裁减,操练 wor 之前在地点有待准备的起始者酒吧
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭