当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Preparation and submission of an acceptable Control Plan are the responsibility of the manufacturing source. Control Plan approval by the Product Engineering Office and by other activities according to QS9000 Quality System Requirements is a prerequisite for initial sample review and approval. The manufacturing source 是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Preparation and submission of an acceptable Control Plan are the responsibility of the manufacturing source. Control Plan approval by the Product Engineering Office and by other activities according to QS9000 Quality System Requirements is a prerequisite for initial sample review and approval. The manufacturing source
问题补充:

  • 匿名
2013-05-23 12:21:38
准备并提交可接受的控制计划的是制造源的责任。
  • 匿名
2013-05-23 12:23:18
一个可接受的控制计划的准备和提议是制造业来源的责任。控制计划认可由产品工程办公室和经根据QS9000质量系统要求的其他活动是一个前提对于最初的样品回顾和认同。制造业来源将保留批准的控制计划和所有最新修正的原物每个QS-9000质量系统并且提供拷贝给设计负责任的PEO。
  • 匿名
2013-05-23 12:24:58
一个可接受的控制计划的准备和提议是制造业来源的责任。 控制计划认可由产品工程办公室和由其他活动根据QS9000质量系统要求是一个前提对于最初的样品回顾和认同。 制造业来源将保留批准的控制计划和所有最新修正的原物每个QS-9000质量系统并且提供拷贝给设计负责任的PEO。
  • 匿名
2013-05-23 12:26:38
准备和提交的可接受的控制计划是制造来源的责任。控制计划审批产品工程处和其他活动按 QS9000 质量体系要求是产品样件最初的审查和批准的先决条件。制造源将保留原来的经批准的控制方案和以后的版本每 QS 9000 质量体系和提供设计一份负责任的 PEO。
  • 匿名
2013-05-23 12:28:18
一个可接受的控制计划的筹备和屈服是制造来源的责任。在产品工程办公室旁边的控制计划审批和按根据 QS9000 Quality 系统要求的其他活动是对于最初例子审核和审批的一个先决条件。制造来源将保留被批准的控制计划的原件和每 QS-9000 质量系统的任何更迟的修订和向设计提供一份复件负责的 PEO。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭