当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Filling system composed of accumulator,plus fluid pipes ,filters,emptying valve,and fluid spear pressure detection device and metering device,pressure of refrigerant system provided by the pressurization system,the stability of the pressure by installing in metering device front of accumulator ,when the refrigerant pre是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Filling system composed of accumulator,plus fluid pipes ,filters,emptying valve,and fluid spear pressure detection device and metering device,pressure of refrigerant system provided by the pressurization system,the stability of the pressure by installing in metering device front of accumulator ,when the refrigerant pre
问题补充:

  • 匿名
2013-05-23 12:21:38
当填充系统累加器组成的,再加上液管,过滤器,排空阀和流体矛压力检测装置和计量装置,由所述加压系统中,压力的稳定提供的制冷剂系统内的压力通过安装在蓄压器的计量装置前方,
  • 匿名
2013-05-23 12:23:18
填装的系统组成由累加器,加上流动管子,过滤器,倒空阀门和可变的矛压力检测装置和测量设备,加压系统提供的冷却液系统压力,压力的稳定通过安装在累加器测量的设备前面,当在集合要求下的冷却液压力,系统为了保证冷冻剂装填的准确性将自动地停止填装工作
  • 匿名
2013-05-23 12:24:58
正在翻译,请等待...
  • 匿名
2013-05-23 12:26:38
充填系统组成的蓄能器,再加上流体管道、 过滤器、 排空阀,和流体矛压力检测装置及计量装置,压力的制冷系统提供的加压送风系统,通过安装在计量设备前面的蓄能器,当制冷剂压力低于设定的需求,以确保制冷剂的灌装精度的系统将自动停止填充工作压力的稳定性
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭