当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:HP circuit of TR-1, pressure test continued at 23 bars, TR-2 at 15.1 bars. Spring hangers release and setting continued. K-0003 lube oil main pump issue solved by vendor. Grating repairs continued. G-1004 MRT aborted tripped on high DP and G-1003 MRT aborted tripped on inboard vibrations but accepted by vend是什么意思?

待解决 悬赏分:1 - 离问题结束还有
HP circuit of TR-1, pressure test continued at 23 bars, TR-2 at 15.1 bars. Spring hangers release and setting continued. K-0003 lube oil main pump issue solved by vendor. Grating repairs continued. G-1004 MRT aborted tripped on high DP and G-1003 MRT aborted tripped on inboard vibrations but accepted by vend
问题补充:

  • 匿名
2013-05-23 12:21:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:23:18
TR-1 HP电路,压力检测继续了在23个酒吧,在15.1酒吧的TR-2。春天挂衣架发布和继续的设置。K-0003供营商解决的润滑油主要泵浦问题。继续的刺耳修理。G-1004被放弃的MRT在高DP绊倒了,并且G-1003被放弃的MRT绊倒了在舱内振动,但是接受由供营商。
  • 匿名
2013-05-23 12:24:58
TR-1 HP电路,压力检测继续在23个酒吧, TR-2在15.1酒吧。 春天继续的挂衣架发行和设置。 K-0003供营商解决的润滑油主要泵浦问题。 继续的刺耳修理。 G-1004 MRT在高DP放弃了绊倒,并且G-1003 MRT在舱内振动放弃了绊倒,但由供营商接受。
  • 匿名
2013-05-23 12:26:38
HP 电路的 TR-1,压力测试继续在 23 酒吧,TR-2 在 15.1 的酒吧。弹簧支吊架释放,并设置继续。K-0003 润滑油的油主泵问题解决由供应商。光栅修理继续。G 1004 捷运中止对高 DP 跳闸和 G-1003年捷运中止跳闸内侧振动,但供应商所接受。
  • 匿名
2013-05-23 12:28:18
TR-1 的 HP 电路,压力测试在 23 间酒吧继续,在 15.1 间酒吧的 TR-2。斯普林衣架发布和落下继续。K-0003 润滑油被供应商解决的主要水泵问题。磨碎被继续的维修。被其中止的 G-1004 MRT 在高 DP 和 G-1003 绊倒 MRT 使被其绊倒的 中止 上的 舷内的 震动 但是 通
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭