当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:目前靖西三线干线非压缩机部分已经投运,支线站场非压缩部分正在建设中。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
目前靖西三线干线非压缩机部分已经投运,支线站场非压缩部分正在建设中。
问题补充:

  • 匿名
2013-05-23 12:21:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:23:18
The Sanyuanli 3 trunk non-compressor section has been the Spur Line, and at the non-compression section is under construction.
  • 匿名
2013-05-23 12:24:58
At present the Jingxi three skeleton line non-compressor part already threw transports, the branch station yard non-constrictor was being constructed.
  • 匿名
2013-05-23 12:26:38
Jingxi three main non-compressor parts have been put into operation at present, regional non-compression station is under construction.
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭