|
关注:1
2013-05-23 12:21
求翻译:At the completion of construction, update the original dimensioned construction drawings to as-built record drawings with individual revision notations. The drawings and other relevant documentation shall be prepared suitable for a formal submission to the local Quality Administration Office for obtaining of Project Co是什么意思?![]() ![]() At the completion of construction, update the original dimensioned construction drawings to as-built record drawings with individual revision notations. The drawings and other relevant documentation shall be prepared suitable for a formal submission to the local Quality Administration Office for obtaining of Project Co
问题补充: |
|
2013-05-23 12:21:38
在完成建设,更新原来的标注尺寸施工图纸到竣工备案的图纸与个别修改符号。
|
|
2013-05-23 12:23:18
在建筑的完成,更新原始的被度量的结构图对与各自的修正记法的现状的记录图画。图画和其他相关的文献准备的适用于一项正式提议对获得的地方质量管理办公室项目完工证书。
|
|
2013-05-23 12:24:58
At the completion of construction, update the original dimensioned construction drawings to as-built record drawings with individual revision notations. 图画和其他相关的文献为一项正式提议将是准备的适当的对地方质量管理办公室为获得项目完工证书。
|
|
2013-05-23 12:26:38
在施工完成后,更新为与个别修订符号作为建立记录图纸原始尺寸的施工图纸。图纸和其他有关文件应编制适合于项目完成证书的获得当地的质量管理办公室正式提交。
|
|
2013-05-23 12:28:18
在建造的完成,更新原始被标注的建造素描到有单独修订符号的如建造创纪录的素描。素描和其他相关的文档将准备对于用于项目完成证书的获得的本地高级管理办公室适用于正式屈服。
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区