当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Materials are the single largest cost item in a PCB Assembly operation. One mistake using incorrect material or unqualified material can be extremely costly both in terms of direct cost, and in the disruptive cost to the operation. Without complete material verification, the factory is playing Russian Roulette with qua是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Materials are the single largest cost item in a PCB Assembly operation. One mistake using incorrect material or unqualified material can be extremely costly both in terms of direct cost, and in the disruptive cost to the operation. Without complete material verification, the factory is playing Russian Roulette with qua
问题补充:

  • 匿名
2013-05-23 12:21:38
材料是在PCB装配操作的单一最大成本项目。
  • 匿名
2013-05-23 12:23:18
材料是在PCB装配生产的唯一最大的成本项目。使用不正确材料或不够资格的材料的一个差错可以是极端昂贵的两个根据直接费用和在制造混乱的费用对操作。没有完全物质证明,工厂演奏与质量、交付和小块的俄罗斯轮盘。没有一种完全证明解答,底线永远将是危险的危险。
  • 匿名
2013-05-23 12:24:58
材料是唯一最大的费用项目在PCB装配生产。 一个差错使用不正确材料或不够资格的材料可以是极端昂贵的两个根据直接费用和在破裂费用到操作。 不用完全物质证明,工厂演奏俄国轮盘赌与质量、交付和小块。 没有一种完全证明解答,底线总将是在危险中。
  • 匿名
2013-05-23 12:26:38
材料是中 PCB 装配操作的单个最大成本项目。一个错误使用不正确或不合格的材料可以在直接成本和操作中断成本极其昂贵。不完整的材料核查,工厂以质量、 交货、 废玩俄罗斯轮盘赌。如果没有完整的验证解决方案,底线总是将岌岌可危。
  • 匿名
2013-05-23 12:28:18
材料是在一次 PCB 集会操作中的单个最大花去的条款。使用错误的材料或不合格的材料的一个错误可能是非常昂贵的在到操作的破坏性的费用,就直接费用而言。没有完整的材料查证地,工厂拿着质量,发送和碎片在玩俄式轮盘。没有一种完整的查证解决方案地,最后的线始终将是遭受危险的。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭