|
关注:1
2013-05-23 12:21
求翻译:The Bridge crossing the structure size, roadbed width, slope, such as rate indicators are measured to ensure that construction meets the design requirements. The early tunnel support in accordance with a given frequency to drill core sampling, and strength test to see jet on behalf of the quality of construction, and t是什么意思?![]() ![]() The Bridge crossing the structure size, roadbed width, slope, such as rate indicators are measured to ensure that construction meets the design requirements. The early tunnel support in accordance with a given frequency to drill core sampling, and strength test to see jet on behalf of the quality of construction, and t
问题补充: |
|
2013-05-23 12:21:38
桥渡结构尺寸,路基宽度,坡度,如利率指标测量,以确保施工符合设计要求。
|
|
2013-05-23 12:23:18
横渡结构大小,路基宽度,倾斜的桥梁,例如率显示被测量保证建筑符合设计要求。早期的隧道支持符合对钻子核心采样的一个特定频率和看见喷气机代表建筑的质量和采取措施的强度试验调整建筑程序控制的措施
|
|
2013-05-23 12:24:58
正在翻译,请等待...
|
|
2013-05-23 12:26:38
桥渡结构尺寸、 路基宽度、 边坡,如率指标进行衡量,以确保施工达到了设计要求。早期的隧道支持按照某一特定的频率,以钻芯取样和强度试验看到射流代表优质的施工,并采取措施,调整施工过程控制措施
|
|
2013-05-23 12:28:18
桥交叉点结构大小, roadbed 宽度,斜坡,例如费率的指标被测量确保建造符合设计要求。按照钻核心采样,代表建造的质量见证喷气式飞机,采取措施调整建造过程控制的力量测试的一个特定频率的早的隧道支持测量
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区