当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:The construction requirements of each project by training, qualified project manager preside, but actually has a lot of engineering is affiliated, project department in order to reduce expenditure, reduce cost, management is not complete. Construction site safety management confusion, construction of electricity, close是什么意思?

待解决 悬赏分:1 - 离问题结束还有
The construction requirements of each project by training, qualified project manager preside, but actually has a lot of engineering is affiliated, project department in order to reduce expenditure, reduce cost, management is not complete. Construction site safety management confusion, construction of electricity, close
问题补充:

  • 匿名
2013-05-23 12:21:38
每个项目通过培训,合格的项目经理主持,但实际上很多工程的附属,项目部为了减少支出,降低成本的施工要求,管理是不完整的。
  • 匿名
2013-05-23 12:23:18
每个项目的建筑要求乘火车,合格的项目负责人主持,但是实际上有很多工程学是附属的,射出部门为了减少开支,减少费用,管理不是完全的。建造场所安全管理混乱,电,闭合的操作,边缘加固的建筑主要不依照没有形成系统,随机性,管理级别是非常低的。
  • 匿名
2013-05-23 12:24:58
每个项目的建筑要求通过火车,具有资格的项目负责人主持,但实际上有很多工程学是附属的,项目部门为了减少开支,减少费用,管理不是完全的。 建造场所安全管理混乱,电,闭合的操作,边缘加固的建筑主要不依照没有形成系统,随机性,管理级别是非常低的。
  • 匿名
2013-05-23 12:26:38
要求每个项目的培训、 合格的项目经理主持,但其实有很多工程的建设附属的为了减少开支、 降低成本,项目部管理不是完整的。施工现场安全管理混乱,施工用电,关闭操作、 边缘保护大多不符合没有形成制度、 随机性、 管理水平是非常低。
  • 匿名
2013-05-23 12:28:18
每位职业项目的建造要求,使项目经理具有资格主持,但是实际上有很多工程是联营的,项目部门以减少支出,减少费用,管理不是完整的。建筑工地安全管理混淆,电的建造,结束操作,边缘保护大部分不符合没有构成系统,随便,管理水平是很低的。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭