当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Becasuse water turbine inertia is large and not suitable for frequently changing load, we suppose pumbed storagecan change load very 30 minute,that is to say,once pumbed storage change the load, it must keep unchanged in the remian of 30 minutes.是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Becasuse water turbine inertia is large and not suitable for frequently changing load, we suppose pumbed storagecan change load very 30 minute,that is to say,once pumbed storage change the load, it must keep unchanged in the remian of 30 minutes.
问题补充:

  • 匿名
2013-05-23 12:21:38
具有因水涡轮惯性大,不适合于频繁变化的负载,我们假设pumbed storagecan变化负荷非常30分钟,也就是说,一旦pumbed存储改变负载,就必须在30分钟内remian保持不变。
  • 匿名
2013-05-23 12:23:18
Becasuse水涡轮惯性大和不适用于常常地改变的装载,我们假设pumbed storagecan变动装载非常30分钟,也就是说,一旦pumbed存贮变动装载,它在remian必须未改变地保留30分钟。
  • 匿名
2013-05-23 12:24:58
Becasuse水涡轮惯性为频繁地改变的装载是大和不适当的,我们假设pumbed storagecan变动装载非常30分钟,也就是说,在remian曾经pumbed存贮变动装载,它必须未改变地保留30分钟。
  • 匿名
2013-05-23 12:26:38
因为水涡轮惯性大,不适合经常变化的负载,我们假设 pumbed 500mb 增量变化荷载很 30 分钟,即是说,一旦 pumbed 存储更改负载,它必须保持在 30 分钟的永存不变。
  • 匿名
2013-05-23 12:28:18
Becasuse 水涡轮惯性是大的和不适用于经常改变负荷,我们猜想被 pumbed 的 storagecan 更改负荷很 30 分钟,是说,一旦被 pumbed 存储改变负荷,它在 30 分钟的 remian 中必须保持不变的。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭