|
关注:1
2013-05-23 12:21
求翻译:Cooling downs continued in the reaction sections of both trains. Reactor preparation for blinding started. Recycle Gas Compressors stopped. H2 spool re-instated at B\L for Isom. MRT completed on charge pumps G-0002 and G-2001. MRT of G-1001 failed due to no flow. Strainer opened and inspected.是什么意思?![]() ![]() Cooling downs continued in the reaction sections of both trains. Reactor preparation for blinding started. Recycle Gas Compressors stopped. H2 spool re-instated at B\L for Isom. MRT completed on charge pumps G-0002 and G-2001. MRT of G-1001 failed due to no flow. Strainer opened and inspected.
问题补充: |
|
2013-05-23 12:21:38
正在翻译,请等待...
|
|
2013-05-23 12:23:18
冷却的下来在两列火车的反应部分继续了。开始的蒙蔽的反应器准备。回收被停止的压气机。H2短管轴被复原在B \\ L Isom的。MRT在灌注泵G-0002和G-2001完成了。G-1001 MRT发生了故障由于没有流程。被打开和被检查的过滤器。
|
|
2013-05-23 12:24:58
冷却的下来在两列火车的反应部分继续了。 反应器准备为开始的蒙蔽。 回收被停止的气体压缩机。 H2短管轴复原了在B \ L为Isom。 MRT在灌注泵G-0002和G-2001完成了。 MRT G-1001不合格由于没有流动。 被打开和被检查的过滤器。
|
|
2013-05-23 12:26:38
冷却继续在两列火车的反应部分的起伏。致盲的反应堆准备开始。循环气体压缩机停了下来。H2 阀芯求情在提单为异构。捷运电荷泵 G-0002 和 G-2001 年完工。捷运的 G-1001年失败,因为没有流动。过滤器打开和检查。
|
|
2013-05-23 12:28:18
使 变冷 在 中继续 反应 将 的 分组 训练。反应体筹备 对使开始的 失明的 。再循环气体 压缩器 停下来。H2 卷轴再次把置于特定地位在 B \ L 对于 Isom 的 。MRT 完成在 费用上注入 G-0002 和 G-2001。G-1001 的 MRT 由于没有流动失败。拉紧者打开和检查。
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区