|
关注:1
2013-05-23 12:21
求翻译:Thermal expansion check was conducted on the reactors (1st and 2nd stage), the delta-P (PDT-1036 high side) sliding shoes was outside the fixed guides, when returned to its tracks 200 mm compensation took place. Inspection to conduct NDT on the line, Inspection team inspected and verified our 是什么意思? 待解决
悬赏分:1
- 离问题结束还有
Thermal expansion check was conducted on the reactors (1st and 2nd stage), the delta-P (PDT-1036 high side) sliding shoes was outside the fixed guides, when returned to its tracks 200 mm compensation took place. Inspection to conduct NDT on the line, Inspection team inspected and verified our
问题补充: |
|
2013-05-23 12:21:38
热膨胀支票上的反应堆(第1和第2阶段)进行, Δ- P( PDT -1036高压侧)滑动鞋是固定的导游外,当返回到其轨道200毫米补偿发生。
|
|
2013-05-23 12:23:18
热扩散检查在反应器(第1个和第2个阶段)被进行,高边)滑鞋子的三角洲P (PDT-1036是在固定的指南之外,当返回到200 mm报偿发生的它的轨道。举办在线的NDT的检查,检查组检查了并且核实了我们的观察。
|
|
2013-05-23 12:24:58
正在翻译,请等待...
|
|
2013-05-23 12:26:38
对反应堆进行了热膨胀系数检查 (第 1 和第 2 阶段),三角洲-P (PDT 1036 高侧) 滑靴是的外固定的指南,当返回到其轨道 200 毫米补偿了地方。检查进行无损检测就行了,视察队视察,并验证我们的观察。
|
|
2013-05-23 12:28:18
正在翻译,请等待...
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区