当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:From table 1, it shows that the flexible budget of 6,000 RMB. Compared the flexible budget with the actual result of this, we can know about that the budget variance of total cost is 14,800. The budget variance is a positive value; the actual result is smaller than the flexible budget. It shows that the flexible budget是什么意思?

待解决 悬赏分:1 - 离问题结束还有
From table 1, it shows that the flexible budget of 6,000 RMB. Compared the flexible budget with the actual result of this, we can know about that the budget variance of total cost is 14,800. The budget variance is a positive value; the actual result is smaller than the flexible budget. It shows that the flexible budget
问题补充:

  • 匿名
2013-05-23 12:21:38
从表1中,它表明了6000元的弹性预算。
  • 匿名
2013-05-23 12:23:18
从表1,它显示那6,000个RMB灵活的预算。灵活的预算与此比较的实际结果,我们能知道关于总成本预算差异是14,800的那。预算差异是正面价值;实际结果小于灵活的预算。它表示,我们做的灵活的预算大于实际。因为总实际成本被减少,因此工作者的奖金不会被扣除。
  • 匿名
2013-05-23 12:24:58
从表1,它显示那6,000 RMB灵活的预算。 灵活的预算与此比较的实际结果,我们能知道关于总成本预算差异是14,800的那。 预算差异是正面价值; 实际结果灵活的预算小于。 它表示,我们做的灵活的预算大于实际。 因为总实际成本被减少,因此工作者的奖金不会被扣除。
  • 匿名
2013-05-23 12:26:38
从表 1,它表明,可变预算的上限 6000 元。比较灵活的预算与实际的结果,我们可以知道关于预算差异的总成本是 14,800。预算差异是一个积极的值 ;实际结果是小于可变预算。它表明我们已经做出的柔性预算比实际更大。由于减少了实际总成本,因此工人的奖金不会扣减。
  • 匿名
2013-05-23 12:28:18
null
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭