当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Regarding the example Norman mentioned (Sims 5pcs set), see the notes Todd made in the spreadsheet - the SP cost is $39, it estimated that no need to use the pallet reloading. But if they need to use pallet reloading, the SP cost must be increase (according to the actual cost on the pallet and labor). Please note.是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Regarding the example Norman mentioned (Sims 5pcs set), see the notes Todd made in the spreadsheet - the SP cost is $39, it estimated that no need to use the pallet reloading. But if they need to use pallet reloading, the SP cost must be increase (according to the actual cost on the pallet and labor). Please note.
问题补充:

  • 匿名
2013-05-23 12:21:38
关于诺曼提到的例子(模拟人生5件套) ,见注释托德在电子表格制作 - SP的成本为39岁,估计无需使用托板重装。
  • 匿名
2013-05-23 12:23:18
关于例子诺曼底人被提及(5pcs被设置的Sims),看笔记在报表做的托德- SP费用是$39,它估计没有需要使用再装的板台。但是,如果他们需要使用再装的板台, SP费用必须是增量(根据在板台和劳方的实际成本)。请注意。
  • 匿名
2013-05-23 12:24:58
关于例子诺曼底被提及的 (Sims 5pcs集合),看笔记在报表做的托德- SP费用是$39,它估计没有需要使用板台再装。 但,如果他们需要使用板台再装, SP费用在板台 (和劳方必须是增量根据实际成本)。 请注意。
  • 匿名
2013-05-23 12:26:38
就这个例子诺曼提到 (Sims 5 件套),注意到托德作电子表格-SP 成本中看到的是 $39,据估计,无需使用的托盘,重新加载。但如果他们需要使用托盘重装,SP 成本必须增加 (按实际成本上的托盘和劳动)。请注意。
  • 匿名
2013-05-23 12:28:18
关于被提及的例子诺曼人 ( Sims 5pcs 落下 ),看在电子表格中被制作的音调的 Todd - SP 费用是 39 美元,它预计那使用重新装入的调色板的没有需要。但是如果他们需要使用重新装入的调色板, SP 费用必须是增长 ( 根据调色板和劳动上的实际费用 )。请注意。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭