当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Catalyst loading in progress in both trains sock loading in progress. Control valves 111-FCV-1001 droped down to clean the inside filter. Stripper re-boiler F-0002 all pilots are on. Stripper re-boiler pump 111-G-0003A running normally, with DP 0.2 bar and discharge pressure 18.5 bar.是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Catalyst loading in progress in both trains sock loading in progress. Control valves 111-FCV-1001 droped down to clean the inside filter. Stripper re-boiler F-0002 all pilots are on. Stripper re-boiler pump 111-G-0003A running normally, with DP 0.2 bar and discharge pressure 18.5 bar.
问题补充:

  • 匿名
2013-05-23 12:21:38
催化剂装填在两列火车的进展袜子装载正在进行中。
  • 匿名
2013-05-23 12:23:18
催化剂装载过程中在两列火车殴打装载过程中。控制阀111-FCV-1001 droped下来清洗里面过滤器。刮毛器再锅炉F-0002所有飞行员继续下去。刮毛器再锅炉泵浦111-G-0003A通常运行,与DP 0.2酒吧的和放电迫使18.5酒吧。
  • 匿名
2013-05-23 12:24:58
催化剂装载进展中在两列火车袜子装货进展中。 控制阀111-FCV-1001 droped下来清洗里面过滤器。 刮毛器再锅炉F-0002所有飞行员继续下去。 刮毛器再锅炉泵浦111-G-0003A通常运行,与DP 0.2酒吧的和放电迫使18.5酒吧。
  • 匿名
2013-05-23 12:26:38
加载中正在加载这两个列车袜子进展的催化剂。控制阀 111-FCV-1001年留神到清洁内部筛选器。汽提塔再沸 F-0002 所有的飞行员都对。汽提塔再沸泵 111 G 0003A 运行正常,与 DP 0.2 栏和排放压力 18.5 栏。
  • 匿名
2013-05-23 12:28:18
催化剂在 进展中装载 的 中的 火车 袜子在 进展中装载 的 。控制阀门清理 的 111-FCV-1001 下车的情绪低落的 在 过滤器中的 。Stripper 重新锅炉 F-0002 所有 飞行员 是 上。Stripper 重新锅炉 水泵 111-G-0003A 的 运转通常,利用 DP 0.2 酒吧和释放压力 18.5 酒吧。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭