当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Can be developed without electronic copy of prime contractor’s schedule, in that it can be based on the hard copy,(which is typically the only version of a schedule given to a subcontractor by a prime, if any at all is provided);是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Can be developed without electronic copy of prime contractor’s schedule, in that it can be based on the hard copy,(which is typically the only version of a schedule given to a subcontractor by a prime, if any at all is provided);
问题补充:

  • 匿名
2013-05-23 12:21:38
可以在没有主承包商的日程的电子版本被开发的,因为它可以根据该硬拷贝, (这是典型的由一原给一个分包调度的唯一版本,如果有的话,在所有被提供);
  • 匿名
2013-05-23 12:23:18
正在翻译,请等待...
  • 匿名
2013-05-23 12:24:58
能被开发,不用主要承包者的日程表的电子拷贝,因为它可以根据硬拷贝,(典型地是日程表的唯一的版本被给转承包商由最初,如果其中任一根本是提供的);
  • 匿名
2013-05-23 12:26:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:28:18
Can be developed without electronic copy of prime contractor's schedule, in that it can be based on the hard copy,(which is typically the only version of a schedule given to a subcontractor by a prime, if any at all is provided);
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭