求翻译:In case of Guheshwori, 11kV incoming line, 630kVA Transformer, power cum machine control center exists. It is proposed to provide new dedicated 11kV line up to HT metering unter provisional sum. The payment under provisional sum shall be subject to authorization by the employer. Then there are two number of Generators 是什么意思? 待解决
悬赏分:1
- 离问题结束还有
In case of Guheshwori, 11kV incoming line, 630kVA Transformer, power cum machine control center exists. It is proposed to provide new dedicated 11kV line up to HT metering unter provisional sum. The payment under provisional sum shall be subject to authorization by the employer. Then there are two number of Generators
问题补充: |
|
2013-05-23 12:21:38
如果Guheshwori , 11千伏进线,台630kVA变压器,电力暨机器控制中心存在。
|
|
2013-05-23 12:23:18
在Guheshwori的情况下, 11kV输入线, 630kVA变压器,附带机器控制中心的力量存在。提议提供新的热忱的11kV排列到HT测量的unter临时总和。在临时总和下的付款将是受授权支配由雇主。然后有两发电器(500kVA和200kVA应急电源的)室内高压互换机的数字。
|
|
2013-05-23 12:24:58
在Guheshwori的情况下, 11kV输入线, 630kVA变压器,力量附带机器控制中心存在。 它提议提供新的热忱的11kV排列到HT测量的unter临时总和。 付款在临时总和之下将是受授权支配由雇主。 然后有二发电器500kVA的数字 (和200kVA为应急电源) 室内高压互换机。 1,250kVA模子类型(低压开关) 齿轮变压器将提供在大厦里面,容易地容易接近为肿瘤。 现有的630kVA变压器根据KUKL将是备用的。
|
|
2013-05-23 12:26:38
Guheshwori,11 千伏传入线路,台容量 630kVA 变压器功率机控制中心暨存在。它被拟提供新的专用 11 千伏线 HT 计量菩提树下大街笔暂列金额。下笔暂列金额的支付款项须由雇主授权。然后有两个数量的发电机 (500kVA 和紧急供应 200kVA) 室内高压开关柜。变压器的 1,250kVA(Mold type) 低压开关装置应提供在大楼里方便 O & M.现有台容量 630kVA 变压器应根据 KUKL 备用。
|
|
2013-05-23 12:28:18
以防 Guheshwori, 11kV 进来的线, 630kVA 改变者,连同机器控制中心的力量存在。拟议提供新专注的 11kV 对于此时 metering unter 临时官员总和排队。在临时的总和下的付款由雇主将取决于授权。然后有二些发电机 (500kVA 和对于紧急供应的 200kVA) 室内高电压 switchgear。1,250 kVA(Mold type) 套低电压开关装备的改变者将在建筑物里面被提供,容易可接近对 O&M。现有 630kVA 跨前者根据 KUKL 将是备用的。
|