求翻译:There are three phases in developing and updating a subcontractor’s trade-specific schedule. First, a baseline or initial schedule is prepared. Second, this schedule is populated with information from the project’s master schedule and feedback from other project participants. Third, the project progress is recorded in 是什么意思?

待解决 悬赏分:1 - 离问题结束还有
There are three phases in developing and updating a subcontractor’s trade-specific schedule. First, a baseline or initial schedule is prepared. Second, this schedule is populated with information from the project’s master schedule and feedback from other project participants. Third, the project progress is recorded in
问题补充:

  • 匿名
2013-05-23 12:21:38
有三个阶段的发展和更新的分包商的贸易具体的时间表。
  • 匿名
2013-05-23 12:23:18
有在开发和更新转承包商的贸易具体日程表的三个阶段。首先,基础线或最初的日程表准备。其次,这日程表居住于与从项目的主日程表的从其他工程参加者的信息和反馈。第三,项目进展在定期更新,包括变动和更新对主日程表和转承包商的工作范围状态,以及事先需要的活动的状况被记录由其他
  • 匿名
2013-05-23 12:24:58
有三个阶段在开发和更新转承包商的换具体日程表。 首先,基础线或最初的日程表准备。 其次,这日程表居住于以信息从项目的主日程表和反馈从其他项目参加者。 第三,项目进展在定期更新被记录,包括变动和更新到主日程表和转承包商的工作范围状态,并且事先需要的活动的状况由其他
  • 匿名
2013-05-23 12:26:38
有三个阶段在编制和更新一个分包商贸易特定计划。首先,准备一个基线或初始计划。第二,从该项目主计划的信息和来自其他项目参与者的反馈被填充本附表。第三,项目的进度被他人记录在定期的更新,包括更改和更新的主时间表和分包商的工作范围状态、 以及系统必备项活动的现况
  • 匿名
2013-05-23 12:28:18
在开发和更新一名分销商的贸易特定的安排方面有三个阶段。首先,一个底线或标注时间表准备。其次,这份时间表从其他项目参与者从项目的优秀的时间表和反馈以信息居住于。三,项目进展在固定的更新中被记载,这包括改变和更新到优秀的时间表和分销商的工作范围状态,以及由另外的所作的首要必备的活动的状态
 
 