求翻译:The causes of these specific conflicts are numerous [often including, e.g., ambiguous contract terms, late supply of material and equipment, changed conditions, poor communications, labor disputes, limited resources, inadequate design,and force majeure events (Harmon 2003)], yet they must be settled because unresolved 是什么意思?

待解决 悬赏分:1 - 离问题结束还有
The causes of these specific conflicts are numerous [often including, e.g., ambiguous contract terms, late supply of material and equipment, changed conditions, poor communications, labor disputes, limited resources, inadequate design,and force majeure events (Harmon 2003)], yet they must be settled because unresolved
问题补充:

  • 匿名
2013-05-23 12:21:38
这些具体冲突的原因是众多的[往往包括,例如,模棱两可的合同条款,材料和设备供应下旬,改变条件,通讯条件差,劳动争议,有限的资源,设计不足,不可抗力事件( 2003哈蒙) ] ,
  • 匿名
2013-05-23 12:23:18
这些具体冲突的原因是许多[经常包括,即,模棱两可的合同期、材料和设备晚供应,被改变的情况、恶劣的通信、劳资纠纷、有限的资金、不充分的设计和不可抗力事件(Harmon 2003)],必须安定他们,因为未解决的冲突可能导致要求和争执,
  • 匿名
2013-05-23 12:24:58
这些具体冲突的起因经常是 (许多包括,即,必须安定模棱两可的合同期限、材料和设备晚供应,被改变的情况、恶劣的通信、劳资纠纷、有限的资金、不充分的设计 (和不可抗力))事件Harmon 2003年,他们,因为未解决的冲突可能导致要求和争执,
  • 匿名
2013-05-23 12:26:38
这些具体的冲突的原因是众多 [常常包括,例如,含糊不清的合同条款、 后期供应的材料和设备,变化了的情况,缺乏沟通、 劳资纠纷、 有限的资源,不足设计和不可抗力事件 (哈蒙 2003)],但他们必须解决未解决的冲突可以导致的索偿和纠纷,因为这
  • 匿名
2013-05-23 12:28:18
这些特定冲突的原因是很多的 ( 经常包括,例如,不确定的合同条款,材料和设备的迟的供应,改变条件,粗略的通信,劳动纠纷,有限资源,不足的设计,不可抗力事件 ( Harmon 2003)),但他们必须被安顿因为未解决的冲突可以导致声称和争论,
 
 