当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:In this paper, the design process of Beijing City, the first assembly integral shear wall of public housing projects are concluded and summarized, introduced the basic situation, assembly type shear wall project design methods, design process, key technologies of building design and structure design, to further promote是什么意思?

待解决 悬赏分:1 - 离问题结束还有
In this paper, the design process of Beijing City, the first assembly integral shear wall of public housing projects are concluded and summarized, introduced the basic situation, assembly type shear wall project design methods, design process, key technologies of building design and structure design, to further promote
问题补充:

  • 匿名
2013-05-23 12:21:38
在本文中,北京市的公共住房项目的​​第一装配整体剪力墙的设计过程进行了总结和归纳,介绍了基本情况,装配式剪力墙工程设计方法,设计过程中,建筑设计和结构设计的关键技术
  • 匿名
2013-05-23 12:23:18
在本文,北京市的设计过程,公共住房项目第一个汇编缺一不可的剪墙壁结束,并且总结,介绍基本的情况,汇编类型剪墙壁项目设计方法、设计过程、大厦设计关键技术和结构设计,进一步提升缺一不可的剪墙壁结构系统提供工程学根据的汇编。
  • 匿名
2013-05-23 12:24:58
正在翻译,请等待...
  • 匿名
2013-05-23 12:26:38
在本文,北京城的设计过程,第一次大会积分剪力墙的公营房屋项目进行归纳和总结,介绍了基本情况,程序集类型剪切墙项目设计方法、 设计过程、 建筑设计和结构设计的关键技术,为进一步促进大会积分剪力墙结构体系提供工程的基础上。
  • 匿名
2013-05-23 12:28:18
在这篇文章中,北京城市的设计过程,首次集会公共住宅群项目的构成的剪力墙被结束和总结,介绍基本处境,集会类型剪力墙项目设计方法,设计过程,建造设计的主要技术和结构设计,进一步促进集会构成的剪力墙结构系统提供工程在的基础上。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭