求翻译:The network is produced according to the critical path analysis method, the earliest start time (EST) and latest start time (LST) are also shown. The critical path have been marked with double slashes. And the critical activities are C, H and I, which refer to “agree production specification”, “production of test batch是什么意思? 待解决
悬赏分:1
- 离问题结束还有
The network is produced according to the critical path analysis method, the earliest start time (EST) and latest start time (LST) are also shown. The critical path have been marked with double slashes. And the critical activities are C, H and I, which refer to “agree production specification”, “production of test batch
问题补充: |
|
2013-05-23 12:21:38
是在网络上,根据所述关键路径分析方法生产,最早开始时间(EST)与最迟开始时间( LST)还示出。
|
|
2013-05-23 12:23:18
网络根据关键途径分析方法,最早开始时间(EST)导致,并且最新的开始时间(名单)也显示。关键路程标记用双重深砍。并且紧急工作是C、H和I,提到“同意生产测试批规格”, “生产”和“包裹并且分别分布”。
|
|
2013-05-23 12:24:58
网络根据关键途径分析方法,最早开始时间EST (导致) ,并且最新的开始时间 (名单) 也显示。 关键路程标记用双重深砍。 并且紧急工作是C、H和I,提到“同意生产测试批规格”, “生产”和“包裹并且分别分布”。
|
|
2013-05-23 12:26:38
网络根据关键路径分析法制作,也表现出的最早开始时间 (EST) 和最晚开始时间 (LST)。关键路径已标记有双反斜线。关键活动,C、 H、 I,指"同意生产规范","测试批量生产"和"打包和分发"分别。
|
|
2013-05-23 12:28:18
网络根据重要路径分析方法被生产,最早的开始时间 (EST) 和最近的开始时间 (LST) 也被显示。重要路径被用两倍的斜杠标明了。以及重要活动是 C, H 和我,参考“同意生产规格,测试一批的生产”和“包裹和分发”分别地。
|