当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:(7) The Contractor shall propose controlled access points to the Site and works Areas from the existing roads in different periods for a notice from the Engineer. The Contractor shall not construct any temporary roadways which may be necessary to afford access to his Site and working Areas without a prior notice from t是什么意思?

待解决 悬赏分:1 - 离问题结束还有
(7) The Contractor shall propose controlled access points to the Site and works Areas from the existing roads in different periods for a notice from the Engineer. The Contractor shall not construct any temporary roadways which may be necessary to afford access to his Site and working Areas without a prior notice from t
问题补充:

  • 匿名
2013-05-23 12:21:38
( 7 )承包商应提出控制接入点的站点和工作区,从不同时期的现有道路从工程师的通知。
  • 匿名
2013-05-23 12:23:18
(7)承包商将提出控制进入点到站点和从现有的路的工作区域用一个通知的不同的期间从工程师。承包商不会修建也许是必要买得起对他的站点的通入和操作范围,不用从工程师的一个预先的通知的任何临时车行道。
  • 匿名
2013-05-23 12:24:58
(7) 承包商将提出受控访问接入点对站点和工作区域从现有的路用不同的期间为一个通知从工程师。 承包商不会修建也许是必要买得起对他的站点的通入和操作范围,不用一个预先的通知从工程师的任何临时车行道。
  • 匿名
2013-05-23 12:26:38
(7) 承建商应在不同的时期,通知那位工程师提出现场和工程领域从现有道路的受控的访问点。承包商不须建造任何临时的巷道,可能有必要访问给予他的网站和工作区,恕不另行通知,从工程师。
  • 匿名
2013-05-23 12:28:18
(7) 承包商将提议被控制的存取点到地点和从工程师操纵来自用于一份通知不同时期的现有路的地区。承包商不将建造可能有必要负担得起对他的地点的访问权限的任何临时路面和从工程师操纵没有一份以前通知的地区。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭