求翻译:(9) The Contractor shall maintain at all times all existing roads, road traffic, road accesses, traffic junctions, pedestrian routes and access to existing buildings within the Site and works Areas during all stages of the traffic diversion schemes he may propose for the execution of the Works. The Contractor shall sub是什么意思? 待解决
悬赏分:1
- 离问题结束还有
(9) The Contractor shall maintain at all times all existing roads, road traffic, road accesses, traffic junctions, pedestrian routes and access to existing buildings within the Site and works Areas during all stages of the traffic diversion schemes he may propose for the execution of the Works. The Contractor shall sub
问题补充: |
|
2013-05-23 12:21:38
( 9 )承包商应时刻保持现有的所有道路,道路交通,道路访问,交通路口,行人路线和访问本网站中的现有建筑物,并在交通分流方案的所有阶段,他可能会提出了执行工作领域
|
|
2013-05-23 12:23:18
(9)承包商一直将维护所有现有的路,公路交通,路通入,交通连接点,步行者路线和通入对原有房屋在站点内和工作区域在他也许为工作的施行提议交通转换计划的所有阶段。
|
|
2013-05-23 12:24:58
(9) 承包商一直将维护所有现有的路,公路交通,路通入,交通连接点,步行者对现有的大厦的路线和通入在站点之内和工作区域在他也许为工作的施行提议交通转换计划的所有阶段期间。 承包商为通知将递交他的提案,从工程师,以后被接受认同从所有有关当局,为了临时通入供应要求在所有现有的楼(s) 保证通入的继续为公众和促进工作的建筑。
|
|
2013-05-23 12:26:38
(9) 承建商应随时保持所有现有道路、 道路交通、 公路交通路口、 行人路线及以内现场和工程领域的交通改道计划所有阶段的现有建筑物的通道他可能提出实施工程。承包商应提交他的建议,从工程师的通知后收到所有有关当局,以确保继续获得公众和便利的建筑工程在任何现有的 building(s) 所需的临时访问提供批准。
|
|
2013-05-23 12:28:18
(9) 承包商都始终将维持现有路,路交通,路存取,交通汇合处,对地点中的现有建筑物的通俗的路线和访问权限和在交通娱乐的所有阶段期间的工作地区策划他可能向工作的执行求婚。承包商将提交他的建议从工程师的一份通知,为在任何现有 building(s) 被要求为公众确保访问权限的继续,促进工作的建造的临时入口的条款从所有相关的当局得到了批准后。
|