求翻译:(1) All materials used in embankments and as filling elsewhere shall be compacted as soon as practicable after deposition. Compaction shall be undertaken to the requirements of this Clause and Table 1.4.12 by approved plant, to achieve a compaction of not less than 98% of the standard at maximum dry density and at the 是什么意思?

待解决 悬赏分:1 - 离问题结束还有
(1) All materials used in embankments and as filling elsewhere shall be compacted as soon as practicable after deposition. Compaction shall be undertaken to the requirements of this Clause and Table 1.4.12 by approved plant, to achieve a compaction of not less than 98% of the standard at maximum dry density and at the
问题补充:

  • 匿名
2013-05-23 12:21:38
( 1 )以堤防为填补其他地方使用的所有材料应尽快沉积后,在切实可行压实。
  • 匿名
2013-05-23 12:23:18
(1)作为在别处填装用于的在堤防和所有材料将变紧密,当可实行在证言以后。击实将被承担对这条目和表1.4.12的要求由批准的植物,达到击实不少于98%标准最大值干密度和在最宜的湿气含量。
  • 匿名
2013-05-23 12:24:58
(1) 用于所有材料在堤防和作为在别处填装将变紧密,当可实行在证言以后。 击实将被承担到这条目和表1.4.12的要求由批准的植物,达到击实不少于98%标准在最大干密度和在最宜的湿气含量。
  • 匿名
2013-05-23 12:26:38
(1) 所有材料用作路堤和填充其他地方应都碾压切实可行范围内尽快后沉积。压实应符合此条文,并表 1.4.12 进行核准厂区,实现压实度不低于 98%的标准在最大干密度和最佳含水量。
  • 匿名
2013-05-23 12:28:18
(1) 都在筑堤中使用的材料和当到别处充满将被压缩一旦可实行在沉积物之后。压实将在被批准的工厂旁边到这条款和表格 1.4.12 的需求被承担,以最适宜的潮湿容量,以最大干密度完成标准的不少于 98% 的一个压实。
 
 