求翻译:(iii) In case the Contractor chooses to retrieve the Tunnel Boring Machines from CST Metro station, the Contractor shall be allowed to do so. In which case the Contractor shall interface with the Civil Contractor of next package (MM3-CBS-UGC-02), for the design and construction of required facilities in the CST metro s是什么意思?

待解决 悬赏分:1 - 离问题结束还有
(iii) In case the Contractor chooses to retrieve the Tunnel Boring Machines from CST Metro station, the Contractor shall be allowed to do so. In which case the Contractor shall interface with the Civil Contractor of next package (MM3-CBS-UGC-02), for the design and construction of required facilities in the CST metro s
问题补充:

  • 匿名
2013-05-23 12:21:38
(三)如果承包商选择检索CST地铁站的隧道掘进机,承包商应被允许这样做。
  • 匿名
2013-05-23 12:23:18
(iii),万一承包商选择从CST地铁车站检索隧道镗床,承包商将允许如此做。
  • 匿名
2013-05-23 12:24:58
(iii) ,万一承包商选择从CST地铁驻地检索隧道镗床,承包商将允许如此做。 在承包商将协调与下个包裹MM3-CBS-UGC-02情况下民用承包商 (),为必需的设施的设计和建筑在CST地铁驻地的临时和永久为此工作这样所有使能的工作和CST地铁驻地的设计和onstruction为保证兼容性和遇见二个承包商的建筑节目充分地被协调和如由工程师批准。 承包商比10m长度为此将协调与UGC-02承包商并且从他接收不是较少的操作范围 (或一个极小的区域如由工程师批准) 从C.S.T.驻地墙壁的里面面孔。 地铁UGC-01 TBMs可能打破in.的地方。