当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:The data do indicate that, given the project duration assigned to each project at the time that construction begins, the performance of DB is the same or slightly better than DBB (depending on the test results consulted) at completing the project within the assigned project duration.是什么意思?

待解决 悬赏分:1 - 离问题结束还有
The data do indicate that, given the project duration assigned to each project at the time that construction begins, the performance of DB is the same or slightly better than DBB (depending on the test results consulted) at completing the project within the assigned project duration.
问题补充:

  • 匿名
2013-05-23 12:21:38
数据确实表明,鉴于分配给每个项目在该施工开始时的项目持续时间, DB的性能是相同的或比DBB (取决于测试结果协商)在分配的项目的持续时间内完成项目稍好
  • 匿名
2013-05-23 12:23:18
数据比DBB表明给出项目期间当时被分配到建筑开始的每个项目, DB表现是同样或有一点改善(根据被咨询的测试结果)在完成在被分配的项目期间内的项目。
  • 匿名
2013-05-23 12:24:58
数据在被分配的项目期间之内比DBB表明给出项目期间当时被分配到建筑开始的每个项目, DB表现是 (同样或轻微地改善) 根据测试结果被咨询在完成项目。
  • 匿名
2013-05-23 12:26:38
数据表明鉴于在建设开始的时间分配给每个项目的工期,DB 的性能是相同或稍优于 DBB (具体取决于测试结果咨询) 在分配的项目工期内完成该项目。
  • 匿名
2013-05-23 12:28:18
数据表示那,考虑到被分配给建造开始的每个当时的项目的项目持续, DB 的表现是相同或稍微变好比 DBB( 取决于被咨询的实验结果 ) 对在被分配的项目期间内完成项目。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭