求翻译:According to the stimulation design, well design, the pad design, can be conducted. Due to the high road density, only rather short access roads have to be constructed. Generally, for all pads and roads, soil movement operations are necessary and to a certain extent, also lumber work. Basement costs and either onsite w是什么意思?

待解决 悬赏分:1 - 离问题结束还有
According to the stimulation design, well design, the pad design, can be conducted. Due to the high road density, only rather short access roads have to be constructed. Generally, for all pads and roads, soil movement operations are necessary and to a certain extent, also lumber work. Basement costs and either onsite w
问题补充:

  • 匿名
2013-05-23 12:21:38
根据刺激的设计,以及设计,垫设计,可进行。
  • 匿名
2013-05-23 12:23:18
根据刺激设计,井设计,垫设计,可以被举办。由于公路密度,相当仅短的通路必须被修建。通常,为所有垫和路,土壤运动操作是必要的,并且某种程度上,也笨重地移动工作。地下室费用和任一本地水存贮或者集中化水存贮设施在演算包括,共计在1.04M€由垫和通路费用的1.92M€决定。
  • 匿名
2013-05-23 12:24:58
根据刺激设计,井设计,垫设计,可以被举办。 由于公路密度,相当仅短的通路必须被修建。 通常,为所有垫和路,土壤运动操作是必要的,并且某种程度上,也笨重地移动工作。 地下室费用和任一onsite浇灌存贮或集中化水存贮设施在演算包括,共计在1.04M€ 1.92M€ 为垫和通路费用。
  • 匿名
2013-05-23 12:26:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:28:18
根据刺激设计,好地设计,垫设计,可以被进行。由于高路密度,唯一相当短的访问权限路必须被建造。通常,对所有垫和路,土壤运动操作是必要的和到某个范围,也伐木工作。地下室花费和要么现场给存储喝水或聚集水存储设施被包括计算在内,对适合对于垫的 1.92ME 的 1.04ME 的总共和存取路花费。
 
 