当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:The idea was to load it with real maps and then let the field develop automatically. Of course, at this stage all the discussed well construction parameters can be implemented rather quickly. The integration of the road network and the rigs figuring out the best way to go, which essentially requires GPS technology, is 是什么意思?

待解决 悬赏分:1 - 离问题结束还有
The idea was to load it with real maps and then let the field develop automatically. Of course, at this stage all the discussed well construction parameters can be implemented rather quickly. The integration of the road network and the rigs figuring out the best way to go, which essentially requires GPS technology, is
问题补充:

  • 匿名
2013-05-23 12:21:38
当时的想法是真正的地图加载它,然后让现场自动发展。
  • 匿名
2013-05-23 12:23:18
想法是用真正的地图装载它然后让领域自动地开发。当然,所有被谈论的好的建筑参量可以宁可迅速在这个状况下被实施。推测最佳的方式的公路网和船具的综合化去,本质上要求GPS技术,是举办的更多effert。
  • 匿名
2013-05-23 12:24:58
想法是用真正的地图装载它然后让领域自动地开发。 当然,所有被谈论的好的建筑参量可以宁可迅速在这个状况下被实施。 推测最佳的方式的公路网和船具的综合化去,根本上要求GPS技术,是举办的更多effert。
  • 匿名
2013-05-23 12:26:38
这个想法是加载与真正的地图,然后让字段会自动地发展。当然,在这个阶段可以很快实现讨论井施工的所有参数。一体化的道路网络和钻井平台,找出最佳的路要走,这基本上需要 GPS 技术,是多努力一点来进行。
  • 匿名
2013-05-23 12:28:18
想法是装载对实际地图的它,然后让领域自动发展。当然,在这个阶段更加好地讨论建造参数可以相当快速被实施。路网络和想出最佳方法去的装置的集成,基本上需要 GPS 技术,是更多 effert 召开。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭