当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:project. Onsite, subcontractors physically carry out the work, often combining labor and materials into production. From a contractual perspective, the legal basis by which a subcontractor may carry out contractual obligations on behalf of a winning contractor is known as vicarious performance (Furst and Ramsey 2012).是什么意思?

待解决 悬赏分:1 - 离问题结束还有
project. Onsite, subcontractors physically carry out the work, often combining labor and materials into production. From a contractual perspective, the legal basis by which a subcontractor may carry out contractual obligations on behalf of a winning contractor is known as vicarious performance (Furst and Ramsey 2012).
问题补充:

  • 匿名
2013-05-23 12:21:38
项目。
  • 匿名
2013-05-23 12:23:18
项目。本地,转承包商完全执行工作,经常结合工料入生产。从一个契约方面,转承包商也许代表一个赢取的承包商实现契约责任的法律依据叫作代理的表现(Furst和Ramsey 2012)。
  • 匿名
2013-05-23 12:24:58
项目。 Onsite,转承包商完全执行工作,经常结合劳方和材料入生产。 从契约透视,转承包商也许代表一个赢取的承包商实现契约责任的法律依据通认作为代理的表现 (Furst和Ramsey 2012年)。
  • 匿名
2013-05-23 12:26:38
项目。现场,分包商物理上开展工作,往往结合劳动力和材料投入生产。从合同的角度来看,可能会让一家分包商开展代表获奖的承包商的合同义务的法律依据被称为替代性能 (富尔斯和拉姆齐 2012年)。
  • 匿名
2013-05-23 12:28:18
项目。现场,分销商按自然规律到生产中执行工作,经常结合劳动和材料。从一个契约的远景,通过其一名分销商可能代表一个胜利的承包商执行契约的义务的法律基础称为替代的表现 ( Furst 和 Ramsey 2012)。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭