当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:It is understood that blocking the “heat load” over a facility is more effective than allowing 100% of the heat load to occur and then using a standard batt insulation to absorb and offer an “R” value to slow the heat from conducting into the facility. The “R” value is only : the recorded time it takes for the total he是什么意思?

待解决 悬赏分:1 - 离问题结束还有
It is understood that blocking the “heat load” over a facility is more effective than allowing 100% of the heat load to occur and then using a standard batt insulation to absorb and offer an “R” value to slow the heat from conducting into the facility. The “R” value is only : the recorded time it takes for the total he
问题补充:

  • 匿名
2013-05-23 12:21:38
可以理解的是阻塞“热负荷”过的设施是比允许的热负荷为100 % ,以发生,然后使用标准的棉絮绝缘吸收,并提供一个“R ”值,以从导电入减慢热量更有效
  • 匿名
2013-05-23 12:23:18
被了解阻拦“热负荷”在设施比允许100%有效热负荷然后发生使用提供一种标准batt的绝缘材料吸收和“R”价值减慢从举办的热入设施。“R”价值只是:它采取为了变浓热装载能通过从被装载的边的材料到凉快的边的记录的时间。
  • 匿名
2013-05-23 12:24:58
它被了解阻拦“热负荷”在设施比允许100%有效热负荷使用一种标准batt绝缘材料然后发生吸收和提供“R”价值减慢热从举办入设施。 “R”价值只是: 它为变浓热装载采取对通行证通过材料从被装载的边到凉快的边的记录的时间。
  • 匿名
2013-05-23 12:26:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:28:18
众所周知那阻挡“热度”在一种设施上方“装货”是比热度的允许 100% 装货出现的更有效的,然后使用吸收和提供使热度速度放慢的一种“R”价值的标准 batt 绝缘从进到设施的召开。“R”价值是仅仅:它为总数的热度花的被记载的时间装货通过材料从加载的边到凉爽的边。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭