当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Vanorsdale (2013) concluded that Duong and Power-Law models may overestimate recovery as a result of changing the flow regime during the first ten years of the life of the wells. He also concluded that continuous changing of flow regime may result in overestimation of recovery.是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Vanorsdale (2013) concluded that Duong and Power-Law models may overestimate recovery as a result of changing the flow regime during the first ten years of the life of the wells. He also concluded that continuous changing of flow regime may result in overestimation of recovery.
问题补充:

  • 匿名
2013-05-23 12:21:38
Vanorsdale ( 2013年)得出的结论是平阳和幂律模型可能高估复苏过程中的第一个十年的井生活的改变流态的结果。
  • 匿名
2013-05-23 12:23:18
Vanorsdale (2013)结束那Duong和在第一期间,电源法律模型也许过高估计补救由于改变流程政权井的生活的十年。他也认为,连续改变流程政权也许导致补救的过高估计。
  • 匿名
2013-05-23 12:24:58
Vanorsdale (2013年) 结束那Duong和 力量法律模型也许过高估计补救由于改变流程政权在一个期间 井的生活的十年。 他也认为,连续改变流程政权也许导致补救的过高估计。
  • 匿名
2013-05-23 12:26:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:28:18
Vanorsdale (2013 年 ) 结束 那 Duong 和 力量法律 模型 由于在井的生活的头一 十年期间更改流量的政权可能高估恢复。他也结束那连续流量的政权的改变愿导致恢复的过分估计。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭