当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Properties of the proposed construction sites on both sides of the Karnaphuli River have to be verified and it has to be checked if a temporary construction site installation as well as permanent installations (pipeline, block valve station) are allowed there.是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Properties of the proposed construction sites on both sides of the Karnaphuli River have to be verified and it has to be checked if a temporary construction site installation as well as permanent installations (pipeline, block valve station) are allowed there.
问题补充:

  • 匿名
2013-05-23 12:21:38
对戈尔诺普利河两岸的建议建筑工地属性必须被验证,它如果一个临时施工现场安装和固定安装(管道,截断阀站)被允许在那里进行检查。
  • 匿名
2013-05-23 12:23:18
提出的建造场所的物产在Karnaphuli河的两边必须被核实,并且必须被检查临时建造场所设施以及永久设施(管道,块阀门驻地)是否允许那里。
  • 匿名
2013-05-23 12:24:58
提出的建造场所的物产在Karnaphuli河的两边必须被核实,并且它必须被检查临时建造场所设施以及永久设施是否 (用管道运输,块阀门驻地) 准许那里。
  • 匿名
2013-05-23 12:26:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:28:18
在 Karnaphuli 河的边上的拟议的建筑工地的财产必须被确认和它必须被检查如果像永久安装设备一样好地的临时建筑工地安装 ( 管道,阻挡阀门站 ) 在那里被允许。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭