当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:In order to avoid pumping of considerable groundwater amounts from the trench, the possibility of laying the pipeline in the water-filled trench is an option, provided that the subsoil is homogeneously fine-grained material and no obstacles like boulders are encountered. Counter measures in order to avoid buoyancy of t是什么意思?

待解决 悬赏分:1 - 离问题结束还有
In order to avoid pumping of considerable groundwater amounts from the trench, the possibility of laying the pipeline in the water-filled trench is an option, provided that the subsoil is homogeneously fine-grained material and no obstacles like boulders are encountered. Counter measures in order to avoid buoyancy of t
问题补充:

  • 匿名
2013-05-23 12:21:38
为了避免从沟槽相当地下水量抽水,铺设在水填充的沟槽的管道的可能性是一种选择,只要该底土是均匀细粒材料和类似的巨石没有障碍遇到。
  • 匿名
2013-05-23 12:23:18
为了避免抽从沟槽的可观的地水数额,放置在充满水的沟槽的管道的可能性是选择,在底土同类地是细颗粒物质和没有障碍条件下,如冰砾遇到。也许需要逆措施为了避免管子的浮力,即具体涂层。
  • 匿名
2013-05-23 12:24:58
为了避免抽可观的地水数额从沟槽,放置管道的可能性在充满水的沟槽是选择,在底土同类地是细颗粒物质和没有障碍条件下,如冰砾遇到。 也许需要逆措施为了避免管子的浮力, e。 g. 具体涂层。
  • 匿名
2013-05-23 12:26:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:28:18
要避免重要的地下水的跳动来自堑壕总计,在水填充的堑壕放管道的可能性是一个选项,只要被遇到。相反地手段以避免烟斗的浮力可能需要,例如,具体层。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭