当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:cash inflows and outflows at the end of planning horizon (study period) at an interest rate. The annual worth (AW) of a project is an equal annual series of dollar amounts for stated study period that is equivalent to the cash inflows and outflows at an interest rate (Sullivan et al. [10]). The economic analysis of the是什么意思?

待解决 悬赏分:1 - 离问题结束还有
cash inflows and outflows at the end of planning horizon (study period) at an interest rate. The annual worth (AW) of a project is an equal annual series of dollar amounts for stated study period that is equivalent to the cash inflows and outflows at an interest rate (Sullivan et al. [10]). The economic analysis of the
问题补充:

  • 匿名
2013-05-23 12:21:38
现金流入和流出,在规划期内(观察期)的利率结束。
  • 匿名
2013-05-23 12:23:18
正在翻译,请等待...
  • 匿名
2013-05-23 12:24:58
现金流入和流出在计划展望期研究期间的 (结尾) 在利率。 每年相当 () 项目的AW价值是美元数额相等的每年系列为与现金流入和流出等是等效的在利率Sullivan的陈述的 (研究期间。 (10)). 对互相排斥选择的经济分析为工程学项目必须完成根据一个可比较的依据。
  • 匿名
2013-05-23 12:26:38
现金流入和流出在规划期 (研究期) 利率结束。(AW) 的一个项目年产值表示的研究期即相当于现金的流入和流出的利率 (沙利文等人 [10]) 是平等的年度系列的美元数额。必须在可比较的基础上互相排斥的选择作为一个工程项目的经济分析。
  • 匿名
2013-05-23 12:28:18
在计划地平线之末的现金流入物和流出物 ( 研究时期 ) 在一个利率。年度价值 (AW) 一个项目中是一同等年度系列圆为在一个利率等于现金流入物和流出的被陈述的研究句号总计 ( 沙利文等等。(10)).经济分析相互用于一个设计项目的专用选择必须在一个可媲美的基础上完成。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭