当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Grid in the accident early warning, protection and control technology is relatively backward. Coal mine in the protection, widespread override trip, voltage fluctuations caused by power failure, leakage protection is not reliable, not being found in time is decreased, refused to move and misoperation, failure can not b是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Grid in the accident early warning, protection and control technology is relatively backward. Coal mine in the protection, widespread override trip, voltage fluctuations caused by power failure, leakage protection is not reliable, not being found in time is decreased, refused to move and misoperation, failure can not b
问题补充:

  • 匿名
2013-05-23 12:21:38
电网事故预警,保护和控制技术相对落后。
  • 匿名
2013-05-23 12:23:18
在事故早期前兆的栅格,保护和控制技术是相对地落后的。
  • 匿名
2013-05-23 12:24:58
栅格在事故早期前兆,保护和控制技术是相对地落后的。 煤矿在保护,普遍代理佣金旅行,电源故障造成的电压波动,漏出保护不是可靠的,不被发现及时被减少,拒绝移动,并且misoperation,失败在故障定位不可能迅速找出绝缘材料缺点和警告,通过尝试所有尝试使用二缺点经常送电,; 高全面保护者唯一作用,恶劣的准确性,设置值根据比率调整,不可能达到在优胜者和下级分站保护协调之间。
  • 匿名
2013-05-23 12:26:38
在事故的早期预警、 保护和控制技术的网格是相对落后。煤矿的保护、 广泛覆盖的旅行、 电源故障引起的电压波动、 漏电保护是不可靠、 不及时发现下降,拒绝了对移动和误操作、 故障可以不快速定位的绝缘故障和警告,往往是通过尝试所有尝试发送电,使用两个故障故障定位 ;高综合保护器功能单一,准确度差、 设定值按比例调整,不能实现之间的上下级变电站保护协调。
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭