当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Precise horizontal direction and vertical angle and distance measurements were carried out with conventional geodetic method. Coordinates of 17 reference points in the proximity of the embankment were determined with conventional methods (Fig.2). Inaddition, 200 objects points located on the dam embankment were measure是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Precise horizontal direction and vertical angle and distance measurements were carried out with conventional geodetic method. Coordinates of 17 reference points in the proximity of the embankment were determined with conventional methods (Fig.2). Inaddition, 200 objects points located on the dam embankment were measure
问题补充:

  • 匿名
2013-05-23 12:21:38
精确水平方向和垂直方向的角度和距离进行测量与常规大地测量方法。
  • 匿名
2013-05-23 12:23:18
写水平的方向的大意,并且直角和距离测量执行了与常规测地学方法。17个参考点座标在堤防附近的确定了与常规方法(Fig.2)。Inaddition,位于水坝堤防的200个目标点被测量使用九根柱子关系参考网络和目标点与同样方法。
  • 匿名
2013-05-23 12:24:58
精确水平的方向和直角和距离测量执行了以常规测地学方法。 17个参考点座标在堤防附近确定了以常规方法 ()。 Inaddition,位于水坝堤防的200个目标点使用九根柱子被测量关系参考网络和目标点以同样方法。
  • 匿名
2013-05-23 12:26:38
与常规大地测量方法进行了精确的水平方向和垂直角度和距离测量。用常规方法 (图 2),测定了路堤在附近的 17 参考点的坐标。此外,200 个对象采用九个支柱涉及参考网络和对象测量点位于坝堤点用相同的方法。
  • 匿名
2013-05-23 12:28:18
精确水平方向和垂直角和距离度量法以传统测量的方法被执行。在筑堤的接近中的坐标值 17 参考的点以传统的方法被确定 ( Fig.2 )。此外, 200 物体点在障碍堤防上定居使用九根柱子被测量以相同的方法关于网络和目的点使相联系。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭