当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Over annual periods, we simulated the system performance for the module described in Section 2 using the Syracuse computer program. I–V characteristics are output for each simulation point, and the maximum power point is found, with trapezoidal integration invoked to obtain an estimate of the energy yield. As before, t是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Over annual periods, we simulated the system performance for the module described in Section 2 using the Syracuse computer program. I–V characteristics are output for each simulation point, and the maximum power point is found, with trapezoidal integration invoked to obtain an estimate of the energy yield. As before, t
问题补充:

  • 匿名
2013-05-23 12:21:38
超过年度期间,我们模拟了使用锡拉丘兹计算机程序在第2节中描述的模块的系统的性能。
  • 匿名
2013-05-23 12:23:18
正在翻译,请等待...
  • 匿名
2013-05-23 12:24:58
正在翻译,请等待...
  • 匿名
2013-05-23 12:26:38
在年度期间,我们模拟模块使用锡拉库扎的计算机程序第 2 节中所述的系统性能。— — V 特性输出模拟的每个点,并找到最大功率点,与梯形积分调用来获得能源产量的估计。作为前,温度维持在 298k (25 ℃) 为所有的仿真,以隔离太阳光谱对系统输出的影响。AERONET 测量,大约每 15 分钟一给出了 AM 是小于 5。我们有桨叶 Sede Boqer 2006 年,为它本来可能为 AERONET 来进行测量,为 98.0%的情报递送。同样,对于 2007 年的 Tamaransset 和太阳村在 2001 年,等效的业绩分别为 97.6%和 98.6%,表明 AERONET 测值反演交付的能
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭