当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Upper Body V1 DPA 2 Status is a summarization of the CAD based and virtual compatibility checks (as defined in design requirements, specifications or guidelines) conducted during the V1 design phase for Craftsmanship and the results with next steps and timing that supports resolution no later than the end of Upper Body是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Upper Body V1 DPA 2 Status is a summarization of the CAD based and virtual compatibility checks (as defined in design requirements, specifications or guidelines) conducted during the V1 design phase for Craftsmanship and the results with next steps and timing that supports resolution no later than the end of Upper Body
问题补充:

  • 匿名
2013-05-23 12:21:38
上身V1 DPA 2状态是基于CAD和虚拟兼容性检查过程中V1设计阶段的工艺与结果与下一步骤,并支持高分辨率定时进行(如设计要求,规范或准则定义)的总结不迟
  • 匿名
2013-05-23 12:23:18
上身V1 DPA 2状态是在技巧和结果的V1设计阶段期间(如对设计要求、规格或者指南定义)被举办的CAD基于的和真正兼容性校验的总结与晚于上身V2的末端支持决议没有的以下步骤和时间。
  • 匿名
2013-05-23 12:24:58
上身V1 DPA 2状态是CAD基于和真正兼容性校验的总结 (如被定义在V1设计阶段为) 比上身V2的末端没有更晚支持决议的技巧和结果期间或者指南被举办的设计要求、规格以以下步骤和时间。 resolving其中任一compatibility issues that Craftsmanship raises as a result of their assessments的Craftsmanship conducts the DPA 2 compatibility checks but D & R Engineering and CAD Engineering are responsib
  • 匿名
2013-05-23 12:26:38
上部身体 V1 DPA 2 状态为基础的 CAD 与虚拟兼容性检查 (如所定义的设计要求、 规范或准则) 的制作工艺和与今后的步骤和支持决议不迟于上部身体 V2 年底的计时结果 V1 设计阶段进行综述。工艺进行 DPA 2 兼容性检查但 D & R 工程和 CAD 工程负责解决工艺提出了由于其摊款的任何兼容性问题。
  • 匿名
2013-05-23 12:28:18
上的 Body V1 DPA 2 状态是被设立的无赖和虚拟的兼容的一个总结检查 ( 如定义在设计要求,规格或准则中 ) 召开在对于技能的 V1 设计阶段期间和具下一个步骤的结果和不迟于为那项支持决议定时上的 Body V2 的终止。技能进行 DPA 2 兼容检查可是 D 和 R 工程和无赖工程负责解决任何兼容发布那项技能提出由于他们的评估。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭