求翻译:32.3 The Performance Bond submitted by the Sub-Contractor shall remain valid until three (3) Months after the Completion Date for the Main Contract. Where the Sub-Contract Works would not be completed by the Completion Date for the Main Contract, the Contractor shall instruct the Sub-Contractor before the expiry of the是什么意思?

待解决 悬赏分:1 - 离问题结束还有
32.3 The Performance Bond submitted by the Sub-Contractor shall remain valid until three (3) Months after the Completion Date for the Main Contract. Where the Sub-Contract Works would not be completed by the Completion Date for the Main Contract, the Contractor shall instruct the Sub-Contractor before the expiry of the
问题补充:

  • 匿名
2013-05-23 12:21:38
32.3提交分包商的履约保证金应保持有效,直至完成日期为主营合同后三(3 )个月。
  • 匿名
2013-05-23 12:23:18
32.3转承包商递交的执行契约在本契约的完成日期以后将依然是合法直到三(3)月。那里转包合同工作不会在本契约的完成日期之前完成,承包商在终止前将指示转承包商。(3)几个月,在本契约的计划的实用完成运作后,执行契约,延长执行契约的期间到期三。
  • 匿名
2013-05-23 12:24:58
32.3 转承包商递交的执行契约将依然是合法直到三 (3个) 月在完成日期以后为本契约。 那里转包工作不会完成不迟于完成日期为本契约,承包商在终止之前将指示转承包商。3个月,在本契约的计划的实用完成运作之后, (执行契约) ,扩大执行契约的期间到期三。
  • 匿名
2013-05-23 12:26:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:28:18
32.3 表现债券由分销商提交将仍然是有效的直到三 (3) 在主要合同的完成日期之后几月。哪里转包工作不会被主要合同的完成日期完成,承包商 the.Performance 债券的呼气延伸表现债券的持续终止三之前将教育分销商 (3) 在主要合同的被预计的实用的完成之后几月工作。
 
 