当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Approximately 60,000kw of power are required for the refinery. 60, 000kw - power generation plant and 20,000kw-power recovery unit in the Fluid Cracking Unit have been included in the refinery scope. The power generation facility is powered by either wind turbine or refinery gas. If Local Water and Power 是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Approximately 60,000kw of power are required for the refinery. 60, 000kw - power generation plant and 20,000kw-power recovery unit in the Fluid Cracking Unit have been included in the refinery scope. The power generation facility is powered by either wind turbine or refinery gas. If Local Water and Power
问题补充:

  • 匿名
2013-05-23 12:21:38
约动力的60000千瓦被要求用于炼油厂。
  • 匿名
2013-05-23 12:23:18
力量60,000kw对于精炼厂大约是必需的。60, 000kw -发电植物和20,000kw力量补救单位在可变的裂化的单位在精炼厂范围包括。发电设施由风轮机或精炼厂气体供给动力。如果地方水和力量部门决定修造能源厂和供水计划供应精炼厂,则这些设施将是从工作的范围去除。
  • 匿名
2013-05-23 12:24:58
力量60,000kw为精炼厂近似地需要。 60, 000kw -电力发动植物和20,000kw力量补救单位在可变的裂化的单位在精炼厂范围包括。 电力发动设施由风涡轮或精炼厂气体供给动力。 如果地方水和力量部门决定修造能源厂和供水计划供应精炼厂,则这些设施将是从工作的范围去除。
  • 匿名
2013-05-23 12:26:38
大约 60 000kw 电源所需的炼油厂。60,000kw-发电厂和 20,流体开裂单元 000kw 功率回收单位已列入炼油厂规模。电力发电设施是由两种风力涡轮或炼油厂气体动力的。如果当地的水和电力部门决定建立的发电厂和水计划,供应炼厂,然后将这些设施从范围中移除的工作。
  • 匿名
2013-05-23 12:28:18
大约 60,000 千瓦的力量为精炼厂需要。60, 000kw - 力量一代植物和 20,000 千瓦力量的恢复 单位 中的 液体砸开 单位的 被包括精炼厂范围在内了。力量一代设施被发动由或者风涡轮或者 精炼厂所作的 气体。如果 本地 水 和 力量 部门决定为一座发电厂和 水建造 计划提供精炼厂的 ,然后这些设施将是来自工作的范围的移动。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭