求翻译:60, 000kw - power generation plant and 20,000kw-power recovery unit in the Fluid Cracking Unit have been included in the refinery scope. The power generation facility is powered by either wind turbine or refinery gas. If Local Water and Power Departments decide to build a power plant and water scheme 是什么意思?

待解决 悬赏分:1 - 离问题结束还有
60, 000kw - power generation plant and 20,000kw-power recovery unit in the Fluid Cracking Unit have been included in the refinery scope. The power generation facility is powered by either wind turbine or refinery gas. If Local Water and Power Departments decide to build a power plant and water scheme
问题补充:

  • 匿名
2013-05-23 12:21:38
60 , 000千瓦 ​​- 发电厂和20000千瓦动力回收装置的流体催化裂化装置已列入炼油厂范围。
  • 匿名
2013-05-23 12:23:18
60, 000kw -发电植物和20,000kw力量补救单位在可变的裂化的单位在精炼厂范围包括。发电设施由风轮机或精炼厂气体供给动力。如果地方水和力量部门决定修造能源厂和供水计划供应精炼厂,则这些设施将是从工作的范围去除。
  • 匿名
2013-05-23 12:24:58
60, 000kw -电力发动植物和20,000kw力量补救单位在可变的裂化的单位在精炼厂范围包括。 电力发动设施由风涡轮或精炼厂气体供给动力。 如果地方水和力量部门决定修造能源厂和供水计划供应精炼厂,则这些设施将是从工作的范围去除。
  • 匿名
2013-05-23 12:26:38
60,000kw-发电厂和 20,流体开裂单元 000kw 功率回收单位已列入炼油厂规模。电力发电设施是由两种风力涡轮或炼油厂气体动力的。如果当地的水和电力部门决定建立的发电厂和水计划,供应炼厂,然后将这些设施从范围中移除的工作。
  • 匿名
2013-05-23 12:28:18
60, 000kw - 力量一代植物和 20,000 千瓦力量的恢复 单位 中的 液体砸开 单位的 被包括精炼厂范围在内了。力量一代设施被发动由或者风涡轮或者 精炼厂所作的 气体。如果 本地 水 和 力量 部门决定为一座发电厂和 水建造 计划提供精炼厂的 ,然后这些设施将是来自工作的范围的移动。
 
 