当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:A single mooring buog (S.M.B.) will be provided about 25 kilometer from the shore to receive crude and ship products. Under water pipelines will connect the mooring buoy with the refinery. The shipping and receiving facilities are designed for 150,000 dead weight short ton tanker which is required approximately every t是什么意思?

待解决 悬赏分:1 - 离问题结束还有
A single mooring buog (S.M.B.) will be provided about 25 kilometer from the shore to receive crude and ship products. Under water pipelines will connect the mooring buoy with the refinery. The shipping and receiving facilities are designed for 150,000 dead weight short ton tanker which is required approximately every t
问题补充:

  • 匿名
2013-05-23 12:21:38
单系泊buog ( SMB)将提供约25公里,而从岸上接收原油和船舶产品。
  • 匿名
2013-05-23 12:23:18
正在翻译,请等待...
  • 匿名
2013-05-23 12:24:58
将提供一 (唯一) 停泊buog S.M.B.大约25公里从接受原油和运输产品的岸。 在水之下管道用精炼厂将连接停泊浮体。 运输和接受设施为150,000负荷量需要近似地每三天的短吨罐车设计,而出于每三天将要求大约二装载产品。
  • 匿名
2013-05-23 12:26:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:28:18
一单个停泊 buog(S.M.B.) 将距岸大约 25 公里被提供收到天然物质和船产品。被淹没管道跟精炼厂一起将连接停泊浮标。发出和接收设施为 150,000 设计沉重的物体每隔三天大约需要的短的吨油船,当大约二使每隔三天将被要求装载产品。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭