求翻译:除灰冷却水泵房位于除灰水系统冷却塔的南部,西邻锅炉酸洗池。占地面积为42m*9m。地基为桩基础,基础底标高为-1.1m,联系梁顶标高与承台顶标高一致。柱子截面大小为400mm*500mm。根据层高,可将除灰冷却水泵房分为2个部分,A~E轴5.5m层框架和E~H轴8.7m层框架。楼板下布置单轨吊。室内布置钢结构柱和钢梁,共2跨,跨距分别为6.5m和7.9m。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
除灰冷却水泵房位于除灰水系统冷却塔的南部,西邻锅炉酸洗池。占地面积为42m*9m。地基为桩基础,基础底标高为-1.1m,联系梁顶标高与承台顶标高一致。柱子截面大小为400mm*500mm。根据层高,可将除灰冷却水泵房分为2个部分,A~E轴5.5m层框架和E~H轴8.7m层框架。楼板下布置单轨吊。室内布置钢结构柱和钢梁,共2跨,跨距分别为6.5m和7.9m。
问题补充:

  • 匿名
2013-05-23 12:21:38
Cooling water pump house located south of ash ash cooling tower water systems , boiler west pickling tank .
  • 匿名
2013-05-23 12:23:18
ash cooling water pump room is located in the gray water system cooling tower in southern and western neighbors boiler acid cleaning pools. Covering an area of 42 M * 9 m. Foundation for pile foundation, and the Foundation floor elevation of - 1.1 M, contact Mr LEUNG top elevation and the desk top e
  • 匿名
2013-05-23 12:24:58
Except that the ash cools the water plant to be located except the buck system cooling tower south, west neighbouring boiler pickling cell.The area is 42m*9m.The ground is the pile foundation, the foundation bottom elevation for - 1.1m, the joint tie beam goes against the elevation with to receive T
  • 匿名
2013-05-23 12:26:38
Ash cooling water pump house in the South of ash removal water system for cooling towers, West of boiler acid washing pool. Covering an area of 42m*9m. Foundation pile foundations, basic bottom level for -1.1M, contact beam top elevation is consistent with Cap top elevation. Columns section size is
  • 匿名
2013-05-23 12:28:18