|
关注:1
2013-05-23 12:21
求翻译:電測位置往後shift 0.5mm 使電測可以執行絕緣檢查是什么意思?![]() ![]() 電測位置往後shift 0.5mm 使電測可以執行絕緣檢查
问题补充: |
|
2013-05-23 12:21:38
Measuring the position of the subsequent shift 0.5mm measuring the electrical insulation inspection can be performed
|
|
2013-05-23 12:23:18
The electrical measurement position shift 0.5mm will enable electrical measurement to carry out the insulation inspection in the future
|
|
2013-05-23 12:24:58
The electrical measurement position shift 0.5mm will enable the electrical measurement to be possible in the future to carry out 絕 the reason inspection
|
|
2013-05-23 12:26:38
Electric shift back 0.5mm enables logging to perform insulation inspection
|
|
2013-05-23 12:28:18
正在翻译,请等待...
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区