|
关注:1
2013-05-23 12:21
求翻译:when drawings are returned "approved " or "approved except as noted",the vendor may start fabrication. when drawings are returned "disapproved ",the vendor should not start fabrication. the vendor muat resubmit corrected drawings for approval within two weeks是什么意思? 待解决
悬赏分:1
- 离问题结束还有
when drawings are returned "approved " or "approved except as noted",the vendor may start fabrication. when drawings are returned "disapproved ",the vendor should not start fabrication. the vendor muat resubmit corrected drawings for approval within two weeks
问题补充: |
|
2013-05-23 12:21:38
当附图中返回“已批准”或“认可,除非另有说明” ,供应商可以开始制造。
|
|
2013-05-23 12:23:18
当图画返回“批准”或“除了所注释处被批准”时,供营商也许开始制造。当图画返回“不许可”时,供营商不应该开始制造。供营商muat在两个星期内再传送校正的图画为获得批准
|
|
2013-05-23 12:24:58
当图画返回“批准”或“除了所注释处被批准”时,供营商也许开始制造。 当图画返回“不许可”时,供营商不应该开始制造。 供营商muat在二个星期之内再传送校正的图画为获得批准
|
|
2013-05-23 12:26:38
正在翻译,请等待...
|
|
2013-05-23 12:28:18
素描归还时“批准”或“批准除了当被注意”,供应商可能开始装配工。 素描被归还“被不赞成的” 时,供应商不应开始装配工。供应商 muat 在两个星期内为审批重新提交被更正的素描
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区