求翻译:The first is the initial state, the activation of all soil displacement, and clear. Secondly, the construction of diaphragm wall, the continuous wall grid activation, again, and bracing excavation, in the simulation of excavation process is divided into four construction conditions是什么意思?

待解决 悬赏分:1 - 离问题结束还有
The first is the initial state, the activation of all soil displacement, and clear. Secondly, the construction of diaphragm wall, the continuous wall grid activation, again, and bracing excavation, in the simulation of excavation process is divided into four construction conditions
问题补充:

  • 匿名
2013-05-23 12:21:38
第一个是在初始状态下,所有的土壤位移的活化,和清晰。
  • 匿名
2013-05-23 12:23:18
第一是初始状态,所有土壤位移的活化作用和清楚。其次,膜片墙壁的建筑,连续的墙壁栅格活化作用,再和支撑的挖掘,在挖掘过程的模仿被划分成四个建筑情况
  • 匿名
2013-05-23 12:24:58
一个是初始状态,所有土壤位移的活化作用和清楚。 第二,膜片墙壁的建筑,连续的墙壁栅格活化作用,再和支撑的挖掘,在挖掘过程的模仿被划分成四个建筑情况
  • 匿名
2013-05-23 12:26:38
第一个是初始的状态,所有的土体位移的活化和清除。其次,建设地下连续墙,连续墙网格激活,再次和令人振奋的开挖,在模拟基坑开挖过程中被划分成四个施工条件
  • 匿名
2013-05-23 12:28:18
第一是最初州,所有土壤代替的激活,清除。其次,隔膜墙的建造,连续墙格子激活,再次,准备挖掘,在挖掘过程的模拟中被分割为四个建造条件
 
 