当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:If in the vicinity of the monitoring points of the foundation pit with a dynamic load, greatly influence the foundation of the monitoring results will be, so should avoid running soil transport vehicles, excavators and other in the monitoring process. The deep excavation of metro station in the most the main arteries o是什么意思?

待解决 悬赏分:1 - 离问题结束还有
If in the vicinity of the monitoring points of the foundation pit with a dynamic load, greatly influence the foundation of the monitoring results will be, so should avoid running soil transport vehicles, excavators and other in the monitoring process. The deep excavation of metro station in the most the main arteries o
问题补充:

  • 匿名
2013-05-23 12:21:38
如果在基坑与动态负荷的监测点的附近,极大地影响监测结果的基础上会,所以应避免在监测过程中运行土运输车辆,挖掘机等。
  • 匿名
2013-05-23 12:23:18
如果在基础坑的检测点附近与动态装载的,很大地影响监视结果的基础将是,因此应该避免跑土壤运输车,挖掘机和其他在监视过程中。
  • 匿名
2013-05-23 12:24:58
如果在基础坑的检测点附近与动态装载,很大地影响监视结果的基础将是,因此应该避免跑土壤运输车,挖掘机和其他在监视过程中。 地铁驻地的深刻的挖掘在多数城市的主要动脉,由于交通问题,那里将是通过在基础坑附近的很大数量的车,因此为了加强基础坑的安全和稳定,我们放置钢在周围的路面,在基础坑附近减少装载的影响,监视应该在高峰期内避免,当车是,如果看上去监测和建筑协调,应该采取多个计量误差方法可以减少,为了保证数据的准确性和可靠性
  • 匿名
2013-05-23 12:26:38
如果附近的一种动态负载基坑监测点,大大影响基础的监测结果将是,所以应该避免运行土运输车辆、 挖掘机等在监测过程中。地铁深基坑工程站在大多数城市,由于交通问题的主要动脉,将大量的车辆传递给周围的基坑,所以为了加强基坑稳定与安全,我们将奠定钢在周围的路面,以减少基坑周边负荷的影响监测应避免在高峰期,当该车辆是很多,如果出现监测和施工协调,应采用的方法的多个测量可以减小误差,以确保数据的可靠性与准确性
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭